Como, St. Paul

1909 brick duplex in Como

The low-slope rear roof over a two-story porch, rebuilt in EPDM after years of tar patches.

Rear of a red brick duplex with a new black EPDM roof over the two-story porch
The same duplex before, with cracked rolled roofing and tar patches
BeforeAfter

Roof

Fully adhered EPDM

Roof

Fully adhered EPDM

Size

340 sq ft

Time on site

1 day

Job type

Retail job

Crew lead

Luis Ortega

Finished

How the job went

The rear roof over the back porches had been patched with tar so many times that water sat in the low spots for days after rain. The owner, who lives in the upper unit, had a leak over the kitchen.

We tore off the old rolled roofing, replaced two sheets of soaked decking and added tapered insulation to move the water toward a new scupper. The EPDM is fully adhered and turns up the brick parapet under a termination bar.

The main roof is shingles in good shape, so we left it alone.

Black EPDM membrane turned up a brick parapet under a metal termination bar

The membrane turns up the parapet under a screwed termination bar.

Create a free website with Framer, the website builder loved by startups, designers and agencies.