Longfellow, Minneapolis

1924 bungalow in Longfellow

Two layers of old shingles off, nine sheets of rotten decking replaced, and new chimney flashing to stop a leak into the upstairs bathroom.

Sage green 1924 bungalow with a new charcoal shingle roof and fallen leaves on the lawn
The same bungalow before, with curled brown shingles and moss along the eave
BeforeAfter

Roof

GAF Timberline HDZ, Charcoal

Roof

GAF Timberline HDZ, Charcoal

Size

24 squares

Time on site

2 days

Job type

Retail job

Crew lead

Tomás Ruiz

Finished

How the job went

Jenna called us about a stain on her bathroom ceiling that came back every spring. The inspection found the chimney’s step flashing pulled loose, and under it, two layers of shingles from 1987 and 2004.

Tear-off took the first morning. Under the chimney, nine sheets’ worth of the original plank boards were soft, and we sent Jenna a photo of each one before replacing it with 7/16 in. OSB. The new roof is GAF Timberline HDZ in Charcoal with new step flashing and counterflashing ground into the mortar joints.

The city signed off on November 3. The one thing we got wrong: the dumpster wheel scraped the edge of the driveway, and we came back the next week to patch it.

New OSB sheets nailed in among old plank roof boards during the tear-off

Nine sheets of new OSB where the old plank boards had rotted under the chimney.