Roseville
1962 rambler in Roseville
A hail claim on a low-slope rambler: new shingles in one day and seamless gutters the next morning.
Size
30 squares
Time on site
1 day
Job type
Hail claim
Crew lead
Pete Lindahl
Finished
How the job went
Mark’s rambler was in the path of the May 2026 storm that crossed Roseville and Falcon Heights. The shingles had hail bruises on every slope and the old white gutters were dented end to end.
The claim covered the roof and the gutters. A 4/12 rambler is the easiest roof we do, and Pete’s crew finished the tear-off and new roof in a single day. The gutter crew came the next morning with the coil machine.
From Mark’s first call to the city’s final inspection took three weeks.

New 6-inch seamless gutters with mitered corners and 3 by 4 inch downspouts.




